CITY HALL: 319-446-7870
Home ▸ FAQ
Find answers to frequently asked questions about elections, building permits, and snow removal. We’ve gathered helpful information to make it easier for residents to understand City regulations and procedures. If you can’t find the answer you’re looking for, please contact City Hall for assistance.
To register to vote in Benton County, you must:
A person is a resident for voting purposes only is the place which is maintained as a home with the intent to remain there permanently or for a definite, indefinite, or undeterminable length of time. A person shall have only one voting residence.
Online:
Visit the website of the Secretary of State or Benton County Auditor’s website (add their website)
In Person:
During regular office hours (8:00 a.m.-4:30 p.m.) residents of Atkins may register in person or pick up an Iowa Mail-In Voter Registration Application at the:
For information on the nomination process for municipal elections, contact the City Clerk’s Office.
For questions regarding your voting location please contact the Benton County Auditor at 319-472-2365.
City of Atkins has only one (1) Precinct and that is the Atkins City Hall.
Many property alterations and additions require a building permit to ensure compliance with local zoning laws and building codes. Contact the City Building Department before starting your project to determine what permits may be required.
Projects that may require a permit include fences, storage sheds, solar panels, decks, dog runs, remodeling, fireplaces, swimming pools, hot tubs, corner lot plantings, and trees.
Fences and storage sheds are subject to local zoning regulations and may require a building permit. Contact the City Building Department to review requirements before installation.
Yes. Trees and plantings, particularly on corner lots, may be subject to zoning regulations to maintain visibility and safety. Contact the City Building Department before making changes.
The City Building Department encourages property owners to reach out before beginning any alterations or additions. Staff can help determine which zoning regulations, building codes, and permit requirements apply to your project.
Snow Plowing and/or ice control operations shall commence under the direction of the Public Works Director and City Administrator. In his absence, the Director’s designated representative will confer with the Director or City Administrator to determine when and where operations will begin in accordance with the following criteria:
Snow and ice control operations are expensive and involve the use of limited personnel and equipment. Consequently snowplowing operations will not generally be conducted for snowfall of less than 1 inch.
Snow will be plowed in a manner so as to provide access as soon as possible and to minimize any traffic obstructions.
Streets and cul-de-sacs are initially plowed with a single pass to open all routes as soon as possible. It is the Public Works Department’s goal to have the entire street system cleaned after a “typical” snowfall in approximately 24 hours. Depending on snowfall conditions and duration of the storm, streets will not always immediately be able to be completely cleared of snow.
Generally, operations will continue until all routes are passable. Widening and cleanup operations may continue immediately or on the following workday depending on conditions and circumstances. Safety of the plow operators and the public is important. Therefore, snowplowing/removal operations may be terminated after 10-12 hours to allow personnel adequate time for rest. There may be instances where this is not possible depending on storm conditions and other circumstances. Operations may also be suspended during periods of limited visibility, significant winds or severe cold so as to not jeopardize the safety of city employees and equipment. Any decision to suspend operations shall be made by the Public Works Director and City Administrator based on the conditions of the storm. The City will still provide access for emergency fire, police and medical services on an “as-needed” basis during a major snow or ice storm.
The City is concerned about the effect of salt and sand on the environment and will limit its use for that reason. Therefore it is the policy of the City to utilize salt and sand at locations where there are hazardous or slippery conditions. This provides for traction but is not intended to provide bare pavement during winter conditions. The City will not be responsible for damage to grass caused by salt and sand and therefore will not make repairs or compensate residents for salt and sand damage to turf areas in the right-of-way.
One of the most frequent and most irritable problems in removal of snow from the public streets is the snow deposited in driveways during plowing operations. Snow that accumulates on the plow blade has no place to go but in the driveway. Snowplow operators make every attempt to minimize the amount of snow deposited in driveways, but the snow can still be significant. Based on the priorities and staffing level, City personnel do not provide driveway cleaning.
Snowplow operators make every effort to remove snow as close to the curb line as practical and to provide access to mailboxes for the Postal Department. However, it is not possible to provide perfect conditions and minimize the damage to mailboxes with the size and type of equipment the City operates. Therefore, the final cleaning adjacent to mailboxes is the responsibility of each resident.
A snow emergency is normally defined as a measurable snow of 2 inches or more. However, any amount of snow combined with ice, rain, and/or wind can also require a snow emergency to be declared. This will be communicated to the public through the internet and by public announcement on social media pages of the City.