Project Update: 1st Street, 2nd Street, 4th Avenue, and 5th Avenue
The City of Atkins is moving forward with plans to replace undersized water mains in the heart of town and add a loop to the system that will improve fire flow. The project is divided into a base bid and two alternates, so the City Council can decide whether to include the two alternate pieces when bids come in. The base bid covers 1st Street, from about 180 feet east of Cardinal Avenue to 4th Avenue; 4th Avenue from Railroad Street to 2nd Street; and 2nd Street from 4th Avenue to 5th Avenue.
Alternate 1 includes a new eight-inch main on 4th Avenue from 3rd Street to Park Ridge Road and Alternate 2 is the 5th Avenue leg of the loop, from 2nd Street to 1st Street.
The four-inch mains in this area are undersized for the fire flow needs. A 2019 Water Distribution Study prepared by Snyder & Associates measured the gap: the Atkins Elementary School at 4th Avenue and 3rd Street needs 1,750 gallons per minute of fire flow, but the current four-inch mains can deliver only about 695 gallons per minute at 20 psi of residual pressure.
The larger eight-inch pipe will improve fire flow to the area and make water service more reliable for the area residents. The project also includes water services connected to the main; replaces aging isolation valves; fire hydrants; and adds valves and hydrants where needed to meet current design standards. The old main will be decommissioned and permanently abandoned.
“These four-inch mains are undersized for the fire flow this part of town needs. Replacing them with eight-inch pipe gives our firefighters the water flow they need and makes service far more reliable for the homes on these streets. Doing this work now prevents the emergency breaks and outages that cost everyone more later.” — Scott Flory, City Administrator
The City Council approved the engineering agreement with Snyder & Associates, Inc. of Cedar Rapids in September 2026, and design of the project is underway. The City anticipates advertising for contractor bids in February 2027. Bids will be taken on the base bid and both alternates and the Council will decide whether to award the alternates based on the prices received.
The project includes installing approximately 2,685 feet of new eight-inch water main, along with new valves, fire hydrants and service lines. If an individual homeowner’s private water service line is not up to City code, it will be replaced as part of the project, and the cost will be specially assessed to the benefited property.
On the attached map, the base bid is shown in blue, Alternate 1 in red, and Alternate 2 in orange. Project plans will be available for viewing at Atkins City Hall, 480 3rd Avenue, Atkins, IA 52206, once the design is complete.